isi_ọkọlọtọ

400kW 500kW Split DC Nchaji Sistemu CCS GB/T EV Charger ọdụ Super Charger Pile

400kw 500Kw 720kW CCS2 GB/T Split DC EV Fast Charging Station Charger maka eletriki ụgbọ ala ,600kW 700kW Split DC Fast EV Charger Station,400kW 500kw Public Charging Station,DC Split Charging Systems Floor-mounted 400kw 500kw Electric Station


  • Ọnụ Ike:400kw 500kw DC Nchaji ọdụ
  • Ntinye voltaji:400V± 15%
  • Ụdị ntinye voltaji:TN-S (Atọ waya ise nke atọ)
  • Ugboro AC Grid:45-65Hz
  • Voltaji mmepụta:200Vdc ~ 750Vdc
  • Mperi voltaji mpụta:≤0.5 nkeji
  • Mmeri dị ugbu a:Mgbe mmepụta ihe ugbu a≥30A:≤±1% Mgbe mmepụta ihe dị ugbu a< 30A:≤±0.3A
  • Ihe kpatara ike:≥0.99
  • Mgbapụta ugbu a:≤10mA
  • Ugboro ike na-eguzogide voltaji:2500VAC
  • Nkọwa ngwaahịa

    Mkpado ngwaahịa

    400kw 500kw Split EV Nchaji ọdụ

    5

    Oke arụmọrụ yana nchekwa ike

    3

    Okpomọkụ na-arụ ọrụ zuru oke

    1

    Oriri ike njikere dị ala

    2

    Nnukwu mmepụta ike ogologo oge niile

    480KW EV ngwa ngwa chaja

    Nchekwa ekwela nkwa

    • 400kw 500kw Split Ụdị DC EV Ịchaji ọdụ

      Ebe nchaji DC nwere ọtụtụ ọkọlọtọ

      N'otu oge na-akwụ ụgwọ ruo 3 EV

      • Nhazi na-agbanwe agbanwe 360kw 400KW 500KW 720KW DC Charging Station
      • Na-akwado CCS, CHAdeMO, GB/T, na NACS Plug
      • Ethernet, Wi-Fi, njikọ 4G
      • OCPP 1.6J & OCPP 2.0
      • Nchaji smart na-akwado nhazi ibu dị ike

    Ọ dị mfe iji

    • 8 '' LCD ihuenyo mmetụ nwere ọtụtụ asụsụ interface
    • Chekwaa nkwenye na ịkwụ ụgwọ site na RFID, ngwa mkpanaka ma ọ bụ POS
    • CCS2 GB/T nkwụnye & chajị nhọrọ
    • GPRS, COM, CAN2.0
    • 360kw 400Kw 500kw 720kW CCS2 GB/T Split DC EV Fast Charging Station Charger ,Split DC Fast EV Charger Station,600kW 720kw Public Charging Station,DC Split Charging Systems Floor-mounted 400kw 500kw Commercial Electric Vehicle Stations
    666
    Ebe nchaji 480kw EV

    400kw 500kw gbawara DC chaja ọdụ

    • Ebe nchaji ngwa ngwa DC nwere ọtụtụ ọkọlọtọ

      • Na-akwado CCS, CHAdeMO, GB/T, na njikọ AC. Ịchaji ihe ruru ụgbọ ala 3 n'otu oge
      • Abụọ CCS2, GB/T, CHAdeMO DC Njikọ ya na Split Rapid Charger Station
      • 240kw 360kw 480kw 600kw 700kw DC Nchaji ọdụ na CCS2 GB/T CHAdeMO NACS nkwụnye
      • Gbawara DC chaja ọdụ 360kw 400kw 500kw 720kw DC Ultra Fast Electric Vehicle Charger Station
    Gbawara DC chaja ọdụ

    Nkọwapụta izugbe

    Ihe chaja DC 400kW DC 500kW ọdụ nchaji 720kW DC chaja
    Ntinye Ntinye voltaji 3-phase 400V ± 15% AC
    Ntinye Ụdị voltaji TN-S (waya nkebi atọ nke ise)
    Ugboro arụ ọrụ 45-65Hz
    Ihe kpatara ike ≥0.99
    Ịrụ ọrụ ≥94%
    Mpụta Ogo voltaji DC - CHAdeMO 500Vdc; CCS 1000Vdc; GBT 1000Vdc;
    AC - Ụdị-2 400V; GBT 400V
    Oke. Mmepụta ugbu a DC - CHAdeMO 125A; CCS 200A; GBT 250A; AC - Ụdị-2 63A; GBT 32A
    Interface Ngosipụta 8 '' LCD Touchscreen
    Asụsụ Chinese, English, French, German, Spanish, Russian, etc.
    Ịkwụ ụgwọ Mobile APP/RFID/POS
    Nzikọrịta ozi Njikọ netwọkụ 4G (GSM ma ọ bụ CDMA)/Eternet
    Usoro nzikọrịta ozi OCPP1.6J ma ọ bụ OCPP2.0
    Environment na-arụ ọrụ Okpomọkụ na-arụ ọrụ -30°C ~ +55°C
    Okpomọkụ nchekwa -35°C ~ +55°C
    Iru mmiri na-arụ ọrụ ≤95% anaghị ekpokọta
    Nchedo IP54
    Ụda ụda <60dB
    Ụzọ jụrụ oyi Ikuku mmanye
    Mechanical Akụkụ (W x D x H) 700*1900*650mm
    Nọmba nke eriri chaja Naanị otu Abụọ
    Ogologo eriri USB 5m ma ọ bụ 7m
    Iwu Asambodo CE/IEC61851-1/IEC61851-23/IEC61851-21-2
    480kw DC chaja ọdụ
    480kw DC chaja ọdụ
    720kw Split EV Nchaji ọdụ

  • Nke gara aga:
  • Osote:

  • Hapụ ozi gị:

    Hapụ ozi gị:

    Dee ozi gị ebe a ziga anyị ya